UNDER CONSTRUCTION WITH OUR FIRST 49,000 SF TENANT. THE REAMINING LOTS ON THE SITE CAN ACCOMIDATE ADDITOINAL BUILD-TO-SUIT OPPORTUNITIES FROM 15,000 - 100,000 SF
INDUSTRIAL, RETAIL, OFFICE & MULTI-FAMILY POTENTIAL
Consisting of over 23 acres, our development site at 955 Portland Road in Saco offers flexible lot sizes and can easily accommodate multiple buildings totaling 200,000 square feet. The first phase of the development is underway with a late summer 2024 completion target. A 49,000 new headquarters for Pack Edge, Inc, a leading packing provider currently based in Portland. This phase of the project will create the connection to the new Flag Pond Road signalized intersection and install connections to critical infrastructure for future phases. Potential uses for the remaining buildable lots on the site include warehouse and manufacturing, office, multi-family or retail with over 300 feet of road frontage in a high traffic area along Route One.
Northland’s relationship with Maine’s leading contractors & designers ensures a high-quality build and expedited construction schedule. Our tenants have the opportunity to incorporate design concepts to increase operational efficiency, highlight corporate branding and take into consideration multiple growth and expansion opportunities into the final design of a facility. They’ll enjoy the very latest technology and the most energy efficient construction materials, thus minimizing operating costs.
Following the completion of construction, the building will be professionally managed by Northland Management Corp, alleviating the stress of property maintenance. This unique location allows for a lighted primary entrance, numerous secondary access points, and sufficient land for abundant parking and loading areas, all conveniently located less than 5 miles from I-95 on/off ramps.
In addition, the site offers:
Access to municipal water/sewer
Front 10± acres of cleared, flat land historically used as a golf driving range
Potential space for retail at front of the site with designated parking
Multiple access points, two of which are scheduled to be signalized intersections (Flag Pond Road / Waterfall Drive from Cascade)
Current MU3 Zoning, Expected zone change by end of 2020 to allow for more flexibility & additional uses.
Convenient Saco Location:
Interstate I-95 North via Hagis Park Way | 4.8 Miles | 8 Minute Drive
Interstate I-195 South | 2.8 Miles | 4 Minute Drive
Interstate I-95 South via I-195 | 4.1 Miles | 8 Minute Drive
Portland International Jetport | 10.4 Miles | 18 Minute Drive
We understand that the structures we create are not finished until they take on the energy and vitality of our tenants. The opportunity to partner on this project carries a great responsibility to create a development that is supportive of your company's growth and beneficial to the economic growth of our community. Interested in partnering with Northland for your next location? Contact us for additional information: